Independent mobile trading client for an on-chain exchange. Trade perps and spot with full TP/SL control, follow the top traders on the leaderboard, and track every wallet in one place. Connect any EVM wallet via WalletConnect, without ever pasting a private key.
















Track as many wallets as you like: view-only for the addresses you just watch, full control for the ones you connect. Equity, uPnL, margin, leverage, win rate, Sharpe and drawdown, plus positions, orders, fills, TWAPs and funding history.
The exchange's leaderboard for 1D, 7D, 30D and All time, ranked by PnL with ROI and volume. Look up any name or address, open the wallet, and star it to follow it in Favorites with live equity, PnL and positions.
Perps, spot and HIP-3: crypto, stocks, indices and commodities. Filter by Crypto, TradFi, HIP-3, Trending or Pre-launch, search by ticker, and favourite the ones you watch most.
Market, limit, scale and TWAP orders, cross or isolated leverage, reduce-only, and take-profit / stop-loss on entry or per position. Close, reverse or close everything from one sheet.
Candles from 1 minute to 1 week with moving averages, RSI, MACD, ADX, ATR, Stochastic and more, saved as your own chart setups. Order book and trades stream over the exchange's WebSocket, no polling lag.
On tablets and in landscape, screens sit side by side: the chart next to the order ticket, your portfolio next to the wallet, the full leaderboard as a sortable table.
Hyprr creates an API wallet (agent key) on your device. Your main wallet approves it once via WalletConnect; from then on orders are signed on the device with EIP-712. Your main wallet's key never leaves your wallet app, and you can revoke the agent on the exchange at any time.
Agent key encrypted at rest (SQLCipher on Android, iOS file protection until first unlock), TLS certificate pinning against the exchange, no cloud backup of the wallet database, optional biometric lock and a Hide PnL switch.